So I have a collection of panels, inverters, racking and wiring to rack jboxes.
After that then what?
I'm told I'll need a master cutoff switch and a production meter between the array and the main breaker panel. At some point the outputs from the micro inverts for the 2 arrays get combined and fed into a master cut off switch to a production meter and into the mains panel, but so far no ideas of what products to be pricing.
This is a typical 5 kw install so I just need examples of what others are buying for grid tied systems
Comments
The drawing will be based on the components you have on hand and relevant local electrical code, so you could use it for permitting.
You may not even need that - if you contact one of our account reps, they may be able to suggest and ship the final components to get you connected. You can reach them at:1.800.409.2257
Good luck.