Hi All,
I'm using standoffs to fasten a Ironridge rail system to a asphalt roof (3 tab)
But not being a prof. roofer not sure how to mount the standoff to the truss system.
The roof is currently cleared down to bare plywood so I'm wondering during the installation of the new roof, when do I mount the standoffs and what sealants and flashing materials to use.
The stand-offs are 4inches tall and 1 1/2 in diameter.
There are several layers that make up a 3 tab roof, so on what layer should the stand-offs be mounted and is the use of flashing optional ?
My guess is I must use a pipe roof flashing, probably made by Oatey. and installed immediately below the top most roofing layer.
But let me know if I'm wrong here.
Comments
Todd,
You are correct on the pipe collar flashing. Here are the steps we recommend:
Regards,
Greentech Renewables
over kill or ?